Quantcast
Channel: Oracle Bloggers
Viewing all articles
Browse latest Browse all 19780

EBS 12.2: New Getting Started Flowchart and Go-Live Readiness Checklist

$
0
0
There is a lot of EBS 12.2 documentation.  The best place to get a high-level overview of what is involved in upgrading to EBS 12.2 can be found here:

We've updated this document, which now includes:

  • Technical Planning Guide
  • Navigational flowchart 
  • Go-live checklist

The Technical Planning Guide helps you identify what you need to think about as you prepare to install or upgrade to Oracle E-Business Suite Release 12.2 and its most significant new feature, Online Patching.

Portion of EBS 12.2 implementation flowchart

Our new navigational flowchart shows you the detailed steps you need to take when moving to Release 12.2 from several different starting points:

  • Performing a fresh installation
  • Upgrading from a Release 11i or pre-12.2 Release 12.x system
  • Upgrading from a Release 12.2.x system to Release 12.2.4

The go-live checklist helps you identify and meet the high-level requirements for a successful go-live.  Checks include operating system requirements, install and upgrade process fundamentals, database and Oracle Fusion Middleware patches, and critical performance fixes. To help ensure success, we recommend proceeding with your go-live only after you have met these essential requirements.

Don't miss any updates

We're updating this document regularly to help streamline the EBS 12.2 implementation process. To be notified when it's updated, add it to your Favorites in My Oracle Support.  See:

Related Articles



Viewing all articles
Browse latest Browse all 19780

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>